To ensure the industrial air cooler have a good cooling effect and it is safe and stable without potential safety hazards such as falling, so the choice of installation location is also very important. It should not only take into account the structure and installation conditions of the factory, but also consider It depends on the use effect of the machine, So what issues should we pay attention to when installing the industrial air cooler.
Industrial air cooler installation methods:
Industrial water cooler hosts are generally installed on the ground, side walls, and roofs. Of course, if these installation conditions are not met in some installation environments, relatively poor indoor installation methods will be adopted, using 40*40*4 angle iron frames and The wall or window panel bolts are connected with each other, rubber is placed between the air duct and the angle iron frame to prevent vibration, and all gaps are sealed with glass or cement mortar. The air supply elbow must be made according to the drawing requirements, and the cross-sectional area must not be less than 0.45 square meters. When installing the air duct, install a boom on the installation chassis so that the entire weight of the air duct is hoisted on the chassis.
skills requirement:
1. The welding and installation of the tripod bracket must be firm;
2. The maintenance platform must be able to support the weight of the unit and maintenance personnel;
3. The host must be installed horizontally;
4. The cross-sections of the host flange and the air supply elbow must be flush;
5. All exterior wall air ducts must be waterproofed;
6. The host junction box must be installed close to the temple to facilitate maintenance;
7. A waterproof bend should be made at the joint of the air duct elbow to prevent water from flowing into the room.