Precautions for Xikoo evaporative air cooler engineering installation

Industry air cooler, also called water-cooled air cooler, evaporative air cooler, etc., are evaporative cooling and ventilation equipment that integrate ventilation, dust prevention, cooling, and deodorization. So, what matters should be paid attention to during the design and installation of Industry air cooler projects?

2

1. Survey site: The construction personnel need to go to the installation site to investigate the actual situation of the site, determine the location of the Industry air cooler, and the practical usage of the installation data, and pay attention to the  air cooler and no heat source and pure air center.

2. Preparations: The engineering personnel must prepare the elbows, iron platform, canvas, flange, tuyere, silencer cotton, air supply pipes and required accessories and installation tools needed in the process of installing Industry air cooler.

3. Fixing the platform: fix both sides of the iron frame made in advance with ropes, and then gradually lower it along the wall. The installation personnel will go down by the professional ladder to confirm the fixed position of the iron frame platform. First confirm a point on one side and use an electric drill to drill Hole, put the shrinking screw, and then use a degree ruler to adjust the level of the iron frame platform on the other side, and then stop fixing. The platform after doing this will meet the requirements of the level. Finally, use the wall bolts to fix it, so that the iron frame platform will fit. For load-bearing requests, the installation personnel who pay attention must wear safety belts.

4. Equipment placement: After the platform installation is over, the Industry air cooler must be placed. First, fix the canvas flange to the air outlet of the Industry air cooler, add white iron to lock it with self-tapping screws, remove the wet curtain, and fix the Industry air cooler with a rope , Gradually decentralized, two installation personnel must be placed on the platform beforehand, guide the environmental protection air conditioner to decentralize, pay attention to tie safety belts, do not wear slippers, clean the inside of the equipment to avoid future blockages.

5. Fixing the elbow: first remove the glass or open a hole in the wall, and then fix the elbow with a rope. The people on the platform pull up the rope, and the people below are careful to carry it. Place the elbow on the window frame and on the platform. People use screws to connect the flanges on both sides, and then the people below use self-tapping screws to firmly fix the elbow to the window frame, and then use the steel wire to fix the two back corners of the elbow on the platform, pay attention Single-sided glue should be used at the joint of the flange to avoid air leakage. The center of the contact between the elbow and the window frame should be covered with one-sided glue to avoid chattering. For the long service life, the elbow should be upturned by 5 cm before entering the room to prevent rainwater from leaking into the room, and glass glue should be applied around it.

6. Piping installation: the indoor air pipe hoisting interval should be well controlled. Ordinarily, the air pipe should be fixed with a screw rod of 1 meter every 3 meters. It is best to stop the connection of the air pipe with a flange. Pay attention to leaving the windshield, which is usually 1/2 of the opening.

7. Water and electricity installation: Each Industry air cooler must be equipped with a separate air switch, and a large air switch is installed independently from other power lines on the main power supply side. It is convenient for after-sales personnel to maintain and the water pipes are beautifully arranged. Each Industry air cooler is set with a separate switch, which is convenient Repair, and set up a separate water outlet at the switch to maintain the host in the future. Ordinary water sources choose daily water, and other water sources need to add filters. Pay attention to the uniformity and degree of installation wiring, and understand the power consumption specifications.

8. Finishing work: After the installation of the Industry air cooler project, the platform must be painted again, the sanitation work on the installation site should be cleaned in time, and the tools and materials should be placed in order to leave a good impression on the customer.


Post time: Dec-30-2021